Proposed Warehouse Layout Design of PT. XYZ Using ARC and BLOCPLAN Methods

  • Fitri Desti Cahyani Program Studi Teknik Industri, Universitas Dian Nuswantoro
  • Tita Talitha Program Studi Teknik Industri, Universitas Dian Nuswantoro

Abstract

PT. XYZ is a manufacturing company engaged in the production of electronic devices such as smartphones, household appliances, and medical equipment. All finished products are stored in the main warehouse of the Logistics Department, which has a total area of 704.76 m². However, the current warehouse layout has not been systematically designed, leading to several operational problems. These issues include product accumulation, limited accessibility to certain items, disruption of internal transportation flow, and a high risk of product damage due to poorly organized storage paths. Random placement of goods without considering product characteristics, transfer volumes, and inter-activity relationships further exacerbates warehouse inefficiency. This study aims to propose a warehouse layout redesign using the Activity Relationship Chart (ARC) approach and the BLOCPLAN method. ARC is employed to map the proximity relationships between areas based on activity importance, while BLOCPLAN is applied to generate several efficient and realistic spatial layout alternatives. The analysis resulted in five alternative layouts with varying efficiency scores, with the best alternative achieving a score of 0.75. The proposed layout is considered more optimal in supporting material flow, accelerating internal distribution processes, and improving overall warehouse space utilization. Furthermore, the new layout supports the implementation of the First In First Out (FIFO) method, which is crucial for maintaining product quality and traceability.

Keywords: Layout, Product Type, Storage, Transportation, Warehouse

References

Adiasa, I., Sartika, & Hudaningsih, N. (2023). Perancangan Tata Letak Fasilitas Gudang Pada Proyek Pembangunan Jetty Pltmgu Lombok Peaker Menggunakan Metode Systematic Layout Planning (Slp) Dengan Algoritma Blocplan. Jurnal Informatika Teknologi Dan Sains, 5(1), 202–209. https://doi.org/10.51401/jinteks.v5i1.2609

Arbi, A. I., & Rendra, H. (2022). Perancangan Tata Letak Fasilitas Lantai Produksi Pada Pembuatan Sepatu Dengan Menggunakan Metode Systematic Layout Planning CV. Sinar Persada Karyatama. IKRAITH-Teknologi, 6(3), 38–52. https://doi.org/10.37817/ikraith-teknologi.v6i3.2305

Azizah, N. F., Apriani, R. A., Pratama, F. M., Zizo A, M. Z., Pradana, F. A., & Azzam, A. (2023). Analisis Perancangan Tata Letak Menggunakan Metode Activity Relationship Chart (ARC) dan Computerized Relationship Layout Planning (CORELAP). Jurnal Teknik Industri: Jurnal Hasil Penelitian Dan Karya Ilmiah Dalam Bidang Teknik Industri, 9(1), 86. https://doi.org/10.24014/jti.v9i1.21902

Budianto, A. D., & Cahyana, A. S. (2021). Re-Layout Tata Letak Fasilitas Produksi Imitasi Pvc Dengan Menggunakan Metode Systematic Layout Planning Dan Blocplan. Jurnal Ilmiah Dinamika Teknik, 4(2), 23–32. https://www.unisbank.ac.id/ojs/index.php/ft1/article/view/8738

Daya, M. A., Sitania, F. D., & Profita, A. (2019). Perancangan Ulang (re-layout) tata letak fasilitas produksi dengan metode blocplan (studi kasus: ukm roti rizki, Bontang). PERFORMA Media Ilmiah Teknik Industri, 17(2), 140–145. https://doi.org/10.20961/performa.17.2.29664

Fatmawati, E., & Rahmawati, N. (2025). Layout Planning of Finished Goods Warehouse Using Class- Based Storage Method Based on Turnover Ratio in PT XYZ. 9(1), 199–208.

Fitrafahira Amelia, Manurung, A. H., Anggraeni, M., Nasution, N. M., Husyairi, K. A., & Ainun, T. N. (2024). Perancangan Ulang Tata Letak Fasilitas Melalui Metode Activity Relationship Chart (ARC) Dan Activity Relationship Diagram (ARD). Jurnal Teknologi Dan Manajemen Industri Terapan, 3(2), 171–180. https://doi.org/10.55826/jtmit.v3i2.362

Gunanti, N. A., Subagyo, A. M., Herwanto, D., & Arifin, J. (2021). Optimasi Tata Letak Fasilitas Menggunakan Algoritma Blocplan dan Corelap. Journal of Industrial and Manufacture Engineering, 5(2), 107–120. https://doi.org/10.31289/jime.v5i2.5555

Karisma, I., & Arifatul Fatimah, Y. (2022). Literature Review : Teknik Perancangan Tata Letak Fasilitas Gudang Pada Perushaan Manufaktur Yang Efisien. Borobudur Engineering Review, 2(1), 12–22. https://doi.org/10.31603/benr.6300

Maskur, A. A., & Andriani, D. (2019). Menggunakan Algoritma Craft Di Pabrik Alumunium Super (Cap Komodo). INAQUE: Journal of Industrial & Quality Engineering, 7 No 1, 45.

Rauf, M., & Radyanto, M. R. (2022). Perbaikan Kinerja Gudang Melalui Penataan Ulang Tata Letak Gudang Suku Cadang Menggunakan Metode Class Based Storage di PT.DN Semarang. 05(02), 111–121.

Sagala, S., & Nababan, R. (2025). Peran perusahaan dalam upaya merekrut tenaga kerja dari masyarakat lokal. Jurnal Hukum Modern, 07(1), 461–469. https://journalpedia.com/1/index.php/jhm

Taufiqulhakim, D., & Fitria, L. (2022). Usulan Perancangan Layout Pertashop Dengan Metode BLOCPLAN di PT. Torio. Prosiding Diseminasi: Fakultas Teknologi Industri, 1(1), 1–11.

Umami, I. R., & Solehudin, S. (2024). Optimalisasi Manajemen Produksi Dalam Meningkatkan Efisiensi Dan Produktivitas. EKOMA : Jurnal Ekonomi, Manajemen, Akuntansi, 3(5), 1076–1086. https://ulilalbabinstitute.id/index.php/EKOMA/article/view/3640

Waruwu, M. (2023). Pendekatan Penelitian Pendidikan: Metode Penelitian Kualitatif, Metode Penelitian Kuantitatif dan Metode Penelitian Kombinasi (Mixed Method). Jurnal Pendidikan Tambusai, 7(1). https://doi.org/10.36706/jbti.v9i2.18333

Zhambertha, L. H., Hapsari, I., & Wibisono, E. (2024). Perbaikan Tata Letak Fasilitas Menggunakan BLOCPLAN di CV Batavia Cutter Prima Surabaya. VI(2), 1–6.
Published
2026-08-18
Section
Articles