Determination of the Spare Parts Inventory Optimum Level at PT. XYZ Using Minimum Maximum Stock Level (MMSL)

  • Nurike Oktavia Politeknik ATI Padang
  • Rapni Nasution Politeknik ATI Padang
  • Wahyuni Amalia Politeknik ATI Padang

Abstract

XYZ company in Sumatera area is operating in the business of oil palm plantation and oleochemicals processing. Its production is based on the supply of mostly from company-owned plantation. In this push system of raw material, production runs continuously resulting the reliability of the machine becomes essential. Material and spare part that support machine cannot be replenish at time when it needed. Thus, overstock can be due to the high cost of storing as well as the risk of storing products. This study aims to calculate minimum and maximum level of inventory that have been the most often stockout occur. The calculation is carried out by Minimum-Maximum Stock Level (MMSL) method on refillable oxygen, turalik oil, steel nut bolt 3/4x3”, steel nut bolt 3/4x4”, welding wire RB 26 dia. 3.2 mm and welding wire LB 52 dia. 3.2mm. MMSL in this study accommodate basic economic order quantity (EOQ). Calculation displays the minimum level, mximum level and optiml order quantity for all six materials. The results are then compared with the actual data and it was found that high fluctuations caused the minimum level results to be in high level and the range between the minimum-maximum levels becomes narrow. One aspect of the reckoning is the demand rate which is calculated by dividing the annual demand by the number of working days. Such justifications should not be used on data with high fluctuations. Therefore, MMSL with basic EOQ should be used on data with small standard deviation

Keywords: level minimum, level maximum, safety stock, economic order quantity

Keywords: economic order quantity, safety stock, minimum level, maximum level

References

Bacchetti, A., Plebiani, F., Saccani, N. & Syntetos, A. A., 2011. Salford Business School. [Online]
Available at: https://usir.salford.ac.uk/id/eprint/19054/1/WP_408-11_Salford.pdf
[Diakses 29 June 2022].

Efendi, J., Hidayat, K. & Faridz, R., 2019. Analisis Pengendalian Persediaan Bahan Baku Kerupuk Mentah Potato dan Kentang Keriting Menggunakan Metode Economic Order Quantity (EOQ). Performa: Media Ilmiah Teknik Industri, 18(2), pp. 125-134.

Farida, I. & Rozini, M. N., 2016. Pengendalian Persediaan Spare Part dan Pengembangan dengan Konsep 80-20 (Analisis ABC) pada Gudang Suku Cadang PT. Astra Internasional Tbk - Daihatsu Sales Operational Cabang Tegal. Tegal, Seminar Nasional Iptek Terapan.

Indarti, T. R., Satibi & Yuniarti, E., 2019. Pengendalian Persediaan Obat dengan Minimum-Maximum Stock Level di Instalasi Farmasi RSUP Dr. Sardjito Yogyakarta. Jurnal Manajemen dan Pelayanan Farmasi, 9(3), pp. 192-202.

Kharisma, G., Vanany, I. & Hartnato, D., 2013. Pengklasifikasian dan Peramalan Sparepart di industry Pupuk (Studi kasus: PT. Petrokimia Gresik)., Surabaya: Institut Teknologi Sepuluh Nopember.

Kumalasari, A. & Rochmah, T. N., 2016. Pengendalian Persediaan Obat Generik dengan Metode MMSL (Minimum-Maximum Stock Level) di Unit Farmasi RS Islam Surabaya. Jurnal Manajemen Kesehatan STIKES Yayasan Rs. Dr. Soetomo, 2(2), pp. 143-152.

Mujiastuti, R., Meilina, P. & Anwar, M., 2018. Implementasi Metode Economic Order Quantity (EOQ) pada Sistem Informasi Produksi Kopi. Jurnal Sistem Informasi, Teknologi Informatika dan Komputer, 8(2), pp. 119-126.

Ningsih & Jauhari, 2017. Analisis Pengendalian Persediaan Spare Part Mesin Produksi di PT. Prima Sejati Sejahtera dengan metode Continuous Review. Performa, 16(1), pp. 245-250.

Oktavia, N., Gustina, A. & Luthvina, R., 2021. Peramalan Penjualan Olein Curah di Perusahaan Pengolahan Kelapa Sawit Menggunakan Double Moving Average. Industrial Vocational E-Journal on Agroindustry, 2(2), pp. 39-45.

Oktavia, N., Henmaidi & Fithri, P., 2020. Perancangan Model Economic Production Quantity Mengakomodasi Continue dan Discrete Demand serta Kebijakan Rework Secara Simultan. Industrial Vocational E-Journal on Agroindustry, 1(1), pp. 8-15.

Sakinah, G. N. & Herdiani, L., 2021. Pengendalian Persediaan Sparepart dengan Metode Klasifikasi ABC pada Perum Damri Cabang Bandung. Triarsie, 18(2), pp. 61-67.

Sofyan, Y., Triana, N. N., Rahayu, A. A. W. & Yulianti, H. T., 2020. Optimalisasi Persediaan bahan Baku Material dengan Metode Min-Max System pada PT Megayaku Kemasan Perdana. Malang, Conference on Innovation and Application of Science and Technology.

Zaldiansyah, A., Jauhari, W. A. & Aisyati, A., 2013. Perencanaan dan Pengendalian Persediaan Spare Part Mesin di Unit Produksi 1 PT. Petrokimia Gresik Menggunakan Kebijakan Can-Order. Performa: Media Ilmiah Teknik Industri, 12(1), pp. 57-68.
Published
2022-11-29
Section
Articles