Scheduling and Controlling Grey Yarn Raw Materials at PT. Panggung Jaya Indah

  • Saufik Luthfianto Universitas Pancasakti Tegal
  • Dian Saadah Universitas Pancasakti Tegal

Abstract

PT Panggung Jaya Indah Pekalongan is a manufacturing company in Indonesia that produces woven sarongs. The company uses conventional raw material scheduling techniques to plan raw materials. Scheduling is used to plan and control the supply of raw materials at the lowest or minimum possible cost. This research was conducted to estimate demand until 2023 and used the help of LINGO software for aggregate scheduling. It then continued with designing the Master Production Schedule (MPS) and raw material scheduling. The development of Material Requirements Planning (MRP) was carried out by comparing the effects of some lot-sizing scoring systems, which is the process of calculating the optimum order size of a material based on netting requirements. Lot-sizing methods in this study include period order quantity (POQ), economic order quantity (EOQ), and least total cost (LTC). By using the lot-sizing method, the company can manage raw material inventory efficiently and effectively. The batch size model used is the one that presents the smallest cost per unit of inventory.

Keywords: Demand, Supply Control, MRP, MPS, Aggregate Scheduling, Lot Sizing

References

Baladraf, M. I. F., & Pogo, T. (2022). Analysis of Job Insecurity, Compensation and Covid Health Protocols Effects on Employee Performance with Work Motivation as a Mediation Variable on Employees of PT Panggung Jaya Indah. Saudi Journal of Business and Management Studies, 7(1), 22–33. https://doi.org/10.36348/sjbms.2022.v07i01.003

Evitha, Y., & Ma’ruf Hs, F. (2019). Pengaruh Penerapan Metode Economic Order Quantity (EOQ) Terhadap Pengendalian Inventori bahan Baku Produksi di PT. Omron Manufacturing Of Indonesia. In Jurnal Logistik Indonesia (Vol. 3, Issue 2). http://ojs.stiami.ac.id

Farieq, P. :, Zain, A., Pembimbing, D., & Anggraeni, R. (n.d.). Analisis Pengendalian Inventori bahan Baku dengan Metode Material Requirements Planning pada PT. Tirta Purbalingga Adijaya Sentul.

Hamirsa, M. H., & Rumita, R. (n.d.). USULAN PENJADWALAN PERAMALAN (FORECASTING) DAN SAFETY STOCK INVENTORI BAHANSPARE PART BUSI CHAMPION TYPE RA7YC-2 (EV-01/EW-01/2) MENGGUNAKAN METODE TIME SERIES PADA PT TRIANGLE MOTORINDO SEMARANG.

Kemala Sari Dan Teguh Sri Ngadono, D. (n.d.). PENERAPAN PERAMALAN AGREGAT PLANNING UNTUK PRODUKSI FREEZER DI PT. DIES.

Lusiani, M., & Sandi, W. (2017). Usulan Penjadwalan dan Pengendalian Inventori bahan Baku Menggunakan Metode Lot Sizing pada Pabrik Mebel Raw Material’s Inventory Planning and Control Using Lot Sizing Method on Furniture Factory. Journal of Industrial Engineering and Management Systems, 10(2). http://journal.ubm.ac.id/index.php/jiems|86

Rahayu, A., Lattu, A., & Mupaat, M. (2022). ANALYSIS OF PRODUCT STOCK INVENTORY FORECASTING USING WEIGHTED MOVING AVERAGE METHOD. Jurnal Teknik Informatika (Jutif), 3(6), 1631–1638. https://doi.org/10.20884/1.jutif.2022.3.6.421

Sulaiman, F. (2015). PENGENDALIAN INVENTORI BAHAN BAKU DENGAN MENGGUNAKAN METODE EOQ PADA UD. ADI MABEL. In Jurnal Teknovasi (Vol. 02, Issue 1).

Suradi, S., Haslindah, A., & Astuti, A. (2020). ANALISA PENGENDALIAN INVENTORI BAHAN BAKU TAPIOCA PEARL DENGAN METODE ECONOMIC ORDER QUANTITY (EOQ) PADA CV. YOTTA SUKSES INDONESIA. ILTEK : Jurnal Teknologi, 15(02), 55–58. https://doi.org/10.47398/iltek.v15i02.24

Wijayanti, P., Sunrowiyati, S., Manajemen, J., Tinggi, S., Ekonomi, I., Negara, K., Mastrip, J., 59 Blitar, N., & Timur, J. (n.d.). Analisis Pengendalian Inventori bahan Baku guna Memperlancar Proses Produksi dalam Memenuhi Permintaan Konsumen pada UD Aura Kompos.
Published
2023-11-30
Section
Articles