Feasibility Analysis of Investment in the Development of Alternative Utilization Facilities for Raw Materials and Fuels at PT. X

  • Bekti Nugrahadi Program Studi Teknik Industri, Universitas Sahid Surakarta
  • Supriyanto Wibowo Program Studi Teknik Industri, Universitas Sahid Surakarta
  • Agung Widiyanto Fajar Sutrisno Program Studi Teknik Industri, Universitas Sahid Surakarta
  • Erna Indriastiningsih Program Studi Teknik Industri, Universitas Sahid Surakarta

Abstract

Indonesia's manufacturing sector has grown, which affects the amount of waste produced.  Waste must be managed by the companies that generate it; if they are unable to do so, the waste may be turned over to a third party.  PT. X is a business that works in manufacturing, particularly in the cement sector.  PT. X is dedicated to producing fuel, raw materials, and energy sources that are efficient in its production process.  In order to meet the company's long-term plan goal of increasing the substitution of energy sources, raw materials, and fuel, facilities for using waste as raw materials and alternative raw materials must be built.  The purpose of this study is to obtain the results of a feasibility study on the investment in the construction of these facilities. The data used in this study are primary data in the form of waste potential, company technical data, investment data, operational data and interviews as secondary data. The methods used in this study are Net Present Value (NPV), Payback Period (PP), and Internal Rate Of Return (IRR). The results of this study obtained a payback period value of 5 years 7 months, an NPV of 6,784,925,409 (NPV > 0), and an IRR of 15.85% so that the investment is feasible to continue.

Keywords: Cement Industry, Internal Rate of Return, Investment Feasibility, Net Present Value, Payback Period

References

Abuk, G.M. and Rumbino, Y. (2020) ‘Analisis kelayakan ekonomi menggunakan metode Net Present Value (NPV), metode Internal Rate of Return (IRR) Payback Period (PBP) pada unit Stone Crusher di CV. X Kab. Kupang Prov. NTT’, Jurnal Teknologi, 14(2), pp. 68–75.

Alfa, B.N. (2022) ‘Analisa Kelayakan Investasi Pendirian Fasilitas Bank Sampah Pada Bank Sampah Unit X Di Wilayah Dki Jakarta’, PROFISIENSI: Jurnal Program Studi Teknik Industri, 10(2), pp. 95–103. https://doi.org/10.33373/profis.v10i2.4499.

Badan Pusat Statistik (2023) Direktori Industri Manufaktur Indonesia 2023.

Darmawan, F.W., Chumaidiyah, E. and Sagita, B.H. (2018) ‘Analisis kelayakan revitalisasi pasar tradisional banjaran Kabupaten Bandung menggunakan container bekas dengan indikator Benefit Cost Ratio, Payback Period, dan Net Present Value’, eProceedings of Engineering, 5(2).

Ernawati, A. et al. (2022) ‘Pengolahan Hasil Medis’, Jurnal Ekonomi & Kebijakan Publik, 13(1), 2022, 57 - 70, 13(1), pp. 57–70.

Faradiba, B. and Musmulyadi, M. (2020) ‘Analisis studi kelayakan bisnis usaha waralaba dan citra merek terhadap keputusan pembelian “alpokatkocok_doubig” di makassar’, PAY Jurnal Keuangan Dan Perbankan, 2(2), pp. 52–61.
Habiburrahman, A.F. (2024) ‘Jurnal Rekayasa Infrastruktur’, 10(1), pp. 9–20.

Harja, J. (2024) ‘Studi Kelayakan Pembangunan Jalan Lawe Sigala Gala-Suka Dame dengan Analisis Sensitivitas’, Sustainable Civil Building Management and Engineering Journal, 1(3), p. 15.

Ira, I. and Setiawan, R. (2023) ‘Analisis Perbandingan Penilaian Keputusan Investasi Menggunakan Metode Net Present Value (NPV) dan Metode Internal Rate of Return (IRR)’, Jurnal Manajemen Dan Bisnis, 1(2), pp. 93–102.

Robby, M.D.A. and Pramestyawati, T.N. (2023) ‘Studi Pengangkutan Dan Pengumpulan Limbah B3 Oleh Transporter Dan Pengumpul Limbah B3’, Environmental Engineering Journal ITATS, 3(2), pp. 182-190. https://doi.org/10.31284/j.envitats.2023.v3i2.5018.
Published
2025-05-27
Section
Articles